W. F. Magann Corporation is continually working on new projects, both large and small, for public and private sector clients. Some of our major current projects include:

Replacement Fuel Pier and Distribution Facility

Langley AFB, Hampton, Virginia

W.F. Magann Corp., Portsmouth, Virginia, was awarded a firm-fixed-price contract for replacement fuel pier and distribution facility, Joint Base Langley-Eustis, Virginia.  Work will be performed in Hampton, Virginia, with an estimated completion date of Sept. 19, 2018. (W91236-16-C-0025).

 

Dry Dock 6 and 7

Norfolk Naval Shipyard, Norfolk, Virginia

W.F. Magann Corp.,* Portsmouth, Virginia, is being awarded a firm-fixed-price construction contract for a stand-alone design-bid-build project that will consist of filling in and paving over concrete dry dock structures 6 and 7 located at the Norfolk Naval Shipyard.  Under this contract, the contractor will be required to fill the dry docks with approximately 65,000 cubic yards of structural fill to be compacted into 6-inch lifts.  Site restrictions for the project require the contractor to bring the building materials to the site via barge and perform much of the work from barges.  Additional work associated with this project includes the installation of micro piles, the construction of a temporary sheet pile bulkhead, and assembly of a sea wall with mooring hardware and utility trench for the berthing of ships across the existing mouths of the dry docks.  Work will be performed in Portsmouth, Virginia, and is expected to be completed by April 2019.  (N40085-16-C-6149).

 

Bulkhead Repair

Naval Base Norfolk – NOB, Norfolk, Virginia

This contract is for repair of steel and concrete sheet pile bulkheads and pile fendering systems at Naval Station Norfolk.  The work to be performed provides for the provision of a steel sheet pile fascia wall in front of the existing bulkhead to mitigate fill loss as well as bulkhead toe stabilization to bring the existing water depth back to the original design depth.  Repairs will fill voids beneath the existing bulkhead-relieving platform to repair sinkholes and make pavement repairs.  A composite timber pile fender system will be provided to replace the deteriorated timber fender system and cleats will be provided along the bulkhead for mooring of small craft.  Work will be performed in Norfolk, Virginia, and is expected to be completed by October 2019.  (N40085-16-C-6153).