Completed Projects

Through the years, W. F. Magann Corporation has completed thousands of projects, both large and small, for public and private sector clients. Some of our completed projects include:

  • RM272-02, Repairing Deperming Piers
    Lambert’s Point Deperming Facility, Norfolk, Virginia
    This design-bid-build project for NAVFAC Mid-Atlantic provided extensive repairs to the U.S. Navy’s Deperming Station located in the middle of the Elizabeth River just off…
     View full project details.
  • Pier 3 General Construction Project
    Northrop Grumman Newport News, Newport News, Virginia
    W. F. Magann Corporation, aided by numerous subcontractors and suppliers, began work on the Pier 3 General Construction Project in November of 2004. The project consisted of…
     View full project details.
  • Dry Docks 10 & 11 – Service Life Extension Project
    Northrop Grumman Newport News, Newport News, Virginia
    The existing cell walls at Dry Docks 10 & 11 were failing due to splitting of the sheet pile interlocks. The dry docks were on the verge of losing their certification, so…
     View full project details.
  • Shoreline Repairs
    U. S. Coast Guard Training Center, Yorktown, Virginia
    The project consisted of installing an anchored steel sheet pile bulkhead starting in the vicinity of the Navy Pier and extending approximately 700 feet to the…
     View full project details.
  • Third Port Pier Replacement
    Fort Eustis Army Base, Fort Eustis, Virginia
    Our contract consisted of the demolition and removal of the existing 100′ x 1000′ pier superstructure, including pulling 4,050 timber piles, removing all trusses, firewall, beams…
     View full project details.
  • Bulkhead and Boardwalk at Constant’s Wharf
    Constant’s Wharf, Suffolk, Virginia
    The project consisted of the development of the downtown waterfront on the Nansemond River for the City of Suffolk. Work included demolition of…
     View full project details.
  • Bulkhead Repair – Cape Hatteras
    U. S. Coast Guard Station, Hatteras Inlet, North Carolina
    Our contract included the demolition and removal of one hundred linear feet (100′) of an existing steel sheet-pile bulkhead and the installation of one hundred linear feet (100′) of…
     View full project details.
  • Dry Dock No. 1, Southside Crane Rail Replacement
    Norfolk Naval Shipyard, Portsmouth, Virginia
    Our subcontract consisted of the replacement of the crane rail on the south side of Dry Dock No. 1 at Norfolk Naval Shipyard. Because the work was within…
     View full project details.
  • Pier 2 Bulbous Bow Extension
    Northrop Grumman Newport News, Newport News, Virginia
    To facilitate the newer aircraft carriers, we were contracted to reconfigure the existing steel sheet pile bulkhead to accommodate the bulbous bow section of…
     View full project details.
  • Revetment, Ponce de Leon Inlet
    Ponce de Leon Inlet, Florida
    Our contract included the installation of five thousand, four hundred linear feet (5400′) of temporary steel sheet-pile bulkhead in order to place seventy-seven thousand tons…
     View full project details.
  • Repair Bulkhead at Navy Boat Docks
    U. S. Navy, Cherry Point, North Carolina
    Our contract included the installation of eight hundred linear feet (800′) of a steel sheet-pile bulkhead…
     View full project details.
  • Virginia Advanced Shipbuilding and Carrier Integration Facility Bulkhead
    Northrop Grumman Newport News, Newport News, Virginia
    The Virginia Advanced Shipbuilding and Carrier Integration (VASCIC) Facility was established in 1998 by the Commonwealth of Virginia’s General Assembly. Located on the banks of…
     View full project details.
  • Structural and POL Repairs to Pier 5
    Naval Station Norfolk, Norfolk, Virginia
    Our contract included the demolition and disposal of the center 23 +/- feet of the concrete pier deck, beams, fiber conduits, and sections of pile caps, the demolition and disposal of…
     View full project details.
  • Shoreline Stabilization, “D” Street Beach
    NAB Little Creek, Virginia Beach, Virginia
    Our contract included the placement of nine thousand tons (9,000 TNS) of rip-rap shoreline protection. This project was…
     View full project details.
  • Structural Repairs to Piers 20-24
    Naval Station Norfolk, Norfolk, Virginia
    Our contract to perform extensive repairs to four (4) of the most actively used submarine piers included structural repairs to piles, pilecaps, beams, slabs, curbing…
     View full project details.
  • Consolidated Refueling Facility (Building 1841)
    Northrop Grumman Newport News, Newport News, Virginia
    The Consolidated Refueling Facility was designed and built by Northrop Grumman Newport News Shipbuilding for refueling nuclear government vessels. Prior to…
     View full project details.
  • Repairs to Shipways 10 & 11
    Northrop Grumman Newport News, Newport News, Virginia
    Our contract consisted of the demolition and installation of a new crane rail system, extensive underground mechanical and electrical distribution systems, and the construction of a…
     View full project details.